News, guides and updates
How rent on formwork, scaffolding and machinery is counted, when it stops running, how late returns are handled and what protects the lessor from bad debt.
Version 1.13 adds a "Procurement" module from request to invoice, budget control with EVM and a baseline plan, 4D BIM visualization and a lighter 3D viewer
How to manage construction subcontractors - contracts, progress certificates, payments and retention without chaos. A practical guide.
What construction cost price is and how to calculate it per project and per item - direct and overhead (indirect) costs and planned vs actual analysis.
Version 1.12 links 2D drawings to the 3D model - calibration, an overlaid scene with pins, "for review" versions and a bridge to an act. We add progress by model elements, an act suggestion from what's built and a more reliable accounting journal.
Why construction material prices are the most unpredictable cost on a project and how the global supply chain hits budgets, schedules and margins.
What bulk density is, why it matters for quantity take-offs and deliveries, and how to convert cubic metres to tonnes (and back) in seconds. A reference table for concrete, sand, gravel, bricks and more - plus an interactive calculator.
Version 1.11 introduces an automatic accounting journal with export to Microinvest and SAF-T BG, a tree-view chart of accounts with a mapping rules editor, a dedicated VAT rates section, a setup wizard for initial configuration, and multi-select for nomenclature items.